On June 2, 2020, Sama Resources Inc. announced that the Company has filed an independent technical report (the “Report”) prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101) supporting the results of a Preliminary Economic Assessment (“PEA”) for the development of its Samapleu Nickel-Copper project located in Ivory Coast, West Africa

Highlights

  • Average annual production of 3,900 tonnes(“t”) of carbonyl nickel powder, 8,400 t of carbonyl iron powder and 14,100 t of copper concentrate over a 20-year mine life
  • Capital costs of $282 million (“M’) including contingency of $37 M
  • Operational costs of $23.96/t milled
  • Pre-tax Net Present Value (“NPV”) at 8% discount rate of $615M and internal rate of return (“IRR”) of 32.5%
  • After-tax NPV at 8% discount rate of $391M and after-tax IRR of 27.2%

On January 15, 2009 (“Effective Date”), Sama Nickel entered into a Syndicate Agreement (“SA”) with SODEMI, a parastatal organization, whereby Sama Nickel has indicated a particular interest in the exploration of an area covered by the former Permit No. 123 (“PR 123”), held by SODEMI, located in Ivory Coast. The former PR 123 encompassed approximately 446 square kilometers.

Figure 1: Exploration permits in Ivory Coast and Guinea. SODEMI applied on March 7, 2018, on behalf of the JV signed with Sama Nickel, for two new exploration permits (Permis de Recherche: PR) for a combined 318 km2 in replacement of the former Samapleu PR 123. Both new Samapleu East and West Exploration Permits have been granted on June 19, 2019. The Zoupleu exploration permit was also granted on June 19, 2019 to SMT.

Upon execution of the SA, Sama Nickel became responsible to finance exploration work programs during the exploration phase of the project through completion of a Bankable Feasibility Study (“BFS”). SODEMI will not contribute to work conducted under the SA.

On October 25, 2015, Sama Nickel and SODEMI extended certain terms of PR 123 resulting in an exploration license extension to June 25, 2017. On June 9, 2017, before the license extension expired, Sama Nickel and SODEMI filed a request for a Mining Permit (Permis d’Exploitation «PE») for an area of 160 square kilometres within the Samapleu exploration license as well as a request for an Exploration Permit (Permis de Recherche «PR») for the remaining area of the Samapleu PR 123, located west of the PE.

In March 2018, following discussions with the government, SODEMI withdrew its application for a Mining Permit and applied for two (2) new exploration permits covering a total area of 318 square kilometers (Samapleu-East and Samapleu-West) to replace the former PR 123. According to a new regulation in Ivory Coast, classified forests must be removed from any new application. Therefore, the total surface area covered by the two (2) new exploration permits is smaller than the initial area covered by the former PR 123 (Figure 1).

On June 19, 2019, the two (2) new exploration permits, Samapleu East (PR838) and Samapleu West (PR839) which cover 318 square kilometers, were granted to SODEMI. Both PRs expire on June 18, 2023, with possible renewal periods totaling up to 12 years. In accordance with both PRs, Sama Nickel agreed to complete an exploration program evaluated at F CFA 2,315,000,000 for PR838 (approximately $5,153,148 as at December 31, 2019) and F CFA 760,000,000 for PR 839 (approximately $1,691,746 as at December 31, 2019) before the term of the exploration permits.

Upon completion of the BFS, the Advisory Committee (“AC”), which consists of two Sama Nickel representatives and two SODEMI representatives, will conclude on the feasibility of the project. If the AC decides to proceed with the project, an Exploitation Entity (“EE”) will be established whereby future funding will be split between Sama Nickel and SODEMI at 66.7% and 33.3%, respectively. The EE will reimburse SODEMI for all costs associated with previous exploration work conducted until January 15, 2009 up to a maximum of F CFA 834,999,457 (approximately $1,858,693 as at December 31, 2019) and will reimburse Sama Nickel for costs associated with exploration work conducted between the Effective Date and the approval of the BFS subject to the approval of the AC which represents a total amount of $21,649,750 as at December 31, 2019.

On September 20, 2019, Sama Nickel and SODEMI signed an amendment to the SA under which the parties confirm the immediate and direct interest of Sama Nickel and SODEMI at 66.7% and 33.3% respectively in the two (2) new exploration permits and this notwithstanding any future request for an exploitation permit. The ownership of the future EE shall be allocated as follows: The ownership of the future JV shall be allocated as follows:

Sama Nickel

60%

SODEMI

30%

Côte d’Ivoire Government

10%

 

100%

In 2016, CVMR was retained to perform a detailed technical study to confirm the commercial viability of producing nickel and iron powders from nickel-iron concentrate obtained from the flotation of the mineralized material of the Samapleu deposits.

In June 2018, DRA Met-Chem an engineering group based in Montreal was retained to continue the technical study on Samapleu deposits. Geotechnical investigation was launched in early August 2018 by two geotechnical engineers from DMeng group (Kingston, Ontario) visiting the Samapleu project. In October 2018, DRA’s Geological Qualify Person (“QP”) visited the project site. In October 2019, two representatives of DRA visited Abidjan, San-Pedro port as well as the project site.

The Company will continue with its exploration efforts aiming at delineating massive sulphide reservoirs that could be the source of high-grade nickel (“Ni”) – copper (“Cu”) – palladium (“Pd”) lenses intercepted in shallower boreholes at the Samapleu deposits.

The Table 1 highlights high-grade drill results at the Samapleu and Yepleu deposits (Figure 1).

Table 1: Highlight table of high-grade drill intercepts previously reported

In 2013, Sama purchased its first Coreteck track mounted CSD1300G wire line drill rig. A second drill rig was purchased in 2014. Since then, all drilling activities were performed internally. Table 2 summarizes the drilling programs from July 2010 to September 2016.

Near surface exploration at the Samapleu Project (< 150 m deep) returned centrally located massive sulphide lenses and veins stock works encased in a thick halo of disseminated sulphide. Nickel and copper tenors of up to 4-5% and 6-8%, respectively, were obtained in massive sulphide material. Eleven boreholes were drilled testing the Tri-dimensional Conductivity Depth Imaging (“CDI”) targets. All high priority CDI targets could be related to the presence of mineralization in various concentrations including semi-massive to massive lenses within what Sama believes to be the mineralized trend extending at depth and laterally.

Hole SM44-693140 intercepted a continuous mineralized zone of 149 m grading 0.30% nickel 0.29% copper, 0.04% cobalt, 0.42 grams per tonne (“gpt”) palladium. The interval started 347 m from surface and included several semi-massive high-grade sulphide lenses, including a 30 m combined interval grading 0.50% nickel, 0.89% copper and 0.83 gpt palladium within intercepts of up to 2.06% nickel and 1.54% nickel.

Hole SM44-683140B intercepted a total of 91m of mineralized pyroxenite with several semi-massive to massive sulphide stringers and lenses before being terminated within the mineralization due to maximum depth capability of our drill rig. Tenors of up to 6.55% copper and an interval of 3.4 m grading 1.12% nickel, 0.50% copper and 1.61 gpt palladium were intercepted at the bottom of the hole which suggest that the mineralization continued at depth.

Hole SM44-428267 intersected 54 m of mineralized pyroxenite, grading 0.96% nickel, 0.76% copper and 0.74 gpt palladium, including a combined 8.0 m of massive sulphide grading 4.08% nickel, 2.43% copper & 2.92 gpt palladium at the Samapleu Main deposit

Several holes should be deepened using a more powerful drilling rig to fully test the bottom of the pipe-like intrusion that forms the large fold and returns very strong conductivity responses over a strike length of 1.6 km and links the Samapleu Main and the Extension 1 deposits.

Drilling results confirm the pipe-like intrusion as a 1.6 km long, large fold linking the Samapleu Main and the Extension 1 deposits and solidifies the geological model at depth.

 

Table 2: Drilling programs from July 2010 to May 2020

Samapleu Extension 1 Deposit

The Samapleu Extension 1 deposit was discovered by Sama Group in June 2010 and is located 1.3 km north of the Samapleu Main deposit. The surface expression of the ultramafic mafic geological host of the Samapleu Extension 1. Samapleu Extension 1 is approximately 2,000 m long by 50 m to 200 m wide and is still open in both directions. The ultramafic mafic host is oriented northeast southwest.

Seventy-eight boreholes totalling 11,557 m were drilled since 2010 at the Samapleu Extension 1 deposit. Borehole SM24-112519 returned 122.0 m grading 0.44% nickel and 0.32% copper and 0.94 gpt of palladium, including 11.0 m @ 1.88% nickel, 0.78% copper and 2.84 gpt palladium; borehole SM25 080542 returned 38.5 m at 0.46% nickel and 0.50% copper and 0.85 gpt palladium and 0.12 gpt platinum; and borehole SM25 039587 returned 129.2 m at 0.26% nickel and 0.17% copper, including 0.41 gpt palladium and 0.06 gpt platinum.

In January and February 2018, Geotech Ltd., completed a 2,889 line-kilometre HTEM survey over the Samapleu and Yepleu areas (PR 300). The HTEM Survey was flown over the area at 200-meter line spacing, using their Versatile Time-Domain Electromagnetic geophysical system. The survey was completed in February 2018.

In January 2020, the hole SM34-459218 intercepted 53 m grading 0.43% nickel, 0.30% copper and 0.52 gpt palladium, including 4.6 m grading 1.98% nickel and 0.92% copper and 2.54 gpt palladium (Figures 3 & 4). The hole was drilled 200 m southwest of the current mineral resources, hence extending the mineralized trend at the deposit.

Zérégouiné Property (PR 300)

Sama CI owns the exploration permit No. 300 (“PR300”), which covers 290 square kilometers of property in Ivory Coast which expires on December 18, 2021. In accordance with PR300, Sama CI agreed to complete an exploration program evaluated at F CFA 2,293,000,000 ($5,104,176 as at December 31, 2019) before the term of the exploration permit.

The Zérégouiné Property is 100% owned by Sama CI and is adjacent to the Samapleu Property.

Yepleu Occurrence

On June 6, 2013, the Company announced the discovery of mineralized surface outcrops grading up to 1.39% nickel and 2.26% copper (tested using a handheld Niton XRF analyzer) located 18 km southwest of the Samapleu nickel-copper deposit.

The occurrence, named Yepleu, covers an area of 24 km2 in the NE corner of the Zérégouiné Exploration Permit. Outcrops with up to 25% disseminated sulphide mineralization in mafic and ultramafic rocks and strong mineralization are seen at surface along a NW-SE strike length of 1.7 km, with some of them showing continuous mineralized horizon of up to 25 m in strike length.

The sector shows a strong HTEM conductivity covering an area of 6 km by 4 km with extension to the SW over more than 17 km (Figure 2).

The disseminated mineralization is typically characterised by fine isolated grains to large granular aggregates of nickel, copper and iron sulphides. Sulphide phases observed so far include pyrrhotite, chalcopyrite, pentlandite and minor pyrite. Pentlandite occurs as inclusions in pyrrhotite. Disseminated sulphide occurs as fine grains of 0.5 to 1 millimetre in diameter, showing a high ratio of pyrrhotite versus chalcopyrite. Sulphide veinlets and fine filaments are also present. Composite grains of sulphide material are dominant, forming sulphide masses of odd shapes ranging from a few millimetres up to several centimetres in any one dimension. The semi-massive mineralization lenses show between 30% to 70% sulphide minerals.

Both HTEM surveys (2013 and 2018) have covered 100% of the property surface area and have identified that the geological host of the newly discovered Yepleu nickel-copper-palladium mineralization extends to the entire length alone an axe-oriented NE-SW for more than 17 km long. Numerous surface gossans and mineralized grab samples including the 8.4%Cu (Niton XRF analyzer) are present at surface. The 2018 HTEM survey outlined several new prospective sectors parallel to those already known (Figure 2).

The Company performed a first phase of Typhoon survey in August 2018 and began the phase 2 Typhoon survey on April 1, 2019. Several additional sectors at Yepleu will be covered with the Typhoon in months to come.

Five holes for 4,191 m were drilled by Capital Drilling an Australian based company in the first half of 2019 and have intersected new mineralization at the Yepleu Sector 1 (Figure 7). The Company is currently drilling testing geophysical targets defined using the Typhoon at Yepleu (Figures 5 & 6).

The hole YE29-556043 returned results with a combined 5.2 m of semi-massive sulfides grading 1.16% nickel, 0.62% copper, 0.24 gpt palladium and 0.21 gpt platinum (using a cut-off-grade of 0.8% nickel) within a larger interval of 37 m of disseminated sulphide mineralization grading 0.41% nickel, 0.31% copper, 0.23 gpt palladium and 0.17 gpt platinum. A second hole drilled at the Yepleu Sector 1 (Figure 7) as follow-up on the mineralized zone intersected on the first deep hole (YE29-556043) returned a mineralized zone of 54 m of disseminated to semi-massive and massive sulfide material from 585 m to 639 m from the surface. Assays results are pending.

Two addition holes were drilled subsequently as follow-up on the mineralized zone intersected on the first deep hole. Hole YE29-553044 returned a mineralized zone of 54 meters of disseminated to semi-massive and massive sulfide material from 585 m to 639 m from the surface. The second hole, YE22-225440 intersected 30 meters of disseminated to semi-massive and massive sulphide, including 1.7 m of massive sulphide (> 70% sulphide).

The Company’s discovered mineralization at 600 m at depth at the Sector 1 within the Yepleu license and within the newly discovered Yacouba Intrusive Complex (dated as the same age as the Bushveld Complex in RSA (2.1 Ga) which host the large nickel-palladium Platreef deposit) is another evidence that the Yacouba intrusion system has the potential to host a significant amount of high-grade nickel-copper-cobalt and palladium in reservoirs and pods that are yet to be discovered. Sama’s have outlined a strike length for the Yacouba Intrusive Complex of more than 66 km. The Yepleu area appears to be the center of the intrusion from where it seems to have “radiated” in all directions. This observation suggests that the Yepleu area is as proximal as we can get to the hot spot.

In March and April 2020, the Company drilled two holes at the Yepleu prospect testing results from the loop 10 series of Typhoon EM surveys (Figure 5 to 7, YE47-716197 & YE47-341408, assays results are pending). Results to date clearly shows a mineralized trend toward the SW going at depth. The down hole EM survey performed in 2019 on borehole YE45 348721 (1,100 m deep) returned a very strong target of 15,000 Conductivity-Thickness (CT) units located 850 m from surface and 75 m to 100 m north of the borehole. The Company is currently drilling hole YE45-365765 (Figure 6) aiming toward this 15,000 CT target.

Figure 2: Samapleu, Zérégouiné, Zoupleu and Grata Exploration Permits showing the combined HTEM 2013 and 2018 conductive potential zones together with the exploration program for 2020.

Figure 3: Samapleu project, surface geology and targets defined using the Typhoon EM system

Figure 4: Samapleu project, 3D model showing geophysical targets generated from Typhoon surveys. There is a very strong target at 550 m from surface returning a Conductivity-Thickness (CT) of 15,000.

Figure 5: Surface map at the Yepleu prospect showing Typhoon EM results for the area surrounding the loops 10 series with the two latest boreholes drilled at the property (YE47-716197 & YE47-341408) to test targets (red) at depth.

Figure 6: 3D presentation map and a cross section SW-NE showing the EM targets (plates) generated from the loop series 10. Results to date clearly shows a mineralized trend toward the SW going at depth. The down hole EM survey performed in 2019 down the borehole YE45 348721 returned a very strong target of 15,000 Conductivity-Thickness (CT) units located 850 m from surface and 75 m to 100m north from the borehole.

Figure 7: Surface map at Yepleu Sector 1, showing the target zone as defined by Mise a la Masse and Borehole TDEM together with the recent borehole’s intersects.